The distribution of electric power will be interrupted for work on the medium voltage and low voltage network in the Corossol district for work on the underground network:
- on Tuesday, July 2 between 8 a.m. and 12 p.m. (Sector: from the Corossol transformer station to the terminal (Public).
- Friday, July 5 between 8 a.m. and 10 a.m. (Sector: from the Corossol transformer station to the terminal (Public).
