Power outage

The distribution of electric power will be interrupted for work on the underground medium voltage and low voltage network:

  • On Tuesday, July 2 between 8 a.m. and 12 p.m.
  • in the Corossol district. Sector: from the Corossol transformer station to the terminal (Public)
  • in the Lurin district. More precisely from n°1589 to n°1298 Route de Lurin.

 

  • Friday, July 5 between 8 a.m. and 12 p.m. in the Corossol district. Sector: from the Corossol transformer station to the terminal (Public)

EDF thanks you for your understanding and apologizes for the inconvenience.